Same critique feedback. In truth I was actually expecting those criticism to hit us due to the fact we did not implement stuff such as sounds and lighting etc in the game, Still I am not really concern (well I do but not that much) as this is easily fixed before the presentation. What i wanted to do now is to get the group together and conduct a quick short meeting, aka a Project Manager role, and show to Miguel what it should be like to plan things out for the team.

After a good solid 25min meeting, I'm pretty sure all of the group members understood WHAT we have to do for the next meeting. Assigning each individual member WHAT and WHEN I expect this to be done and be firm with the decision on dateline.


Miguel u need to note this down as a PM in a nicer document format. In future meeting next semester you wil have to do wat i did just now. kinda like a scrum master
Riz: Promo Art, Curved Slope, Training Area, Crosshaier(?), Animated 2D(?)
John: Area next to museum segment, Sounds, ground pavement, traffic light(?)
Joe: Ligting, particles, Rails
Programmers: Networking, Countdown
Sounds needed: Grapple, jump, Bump to wall, railgrind and wallride

This was the outcome from the discussion and the goals that have to be met before next week presentation. I would love to a Project Manager but again it's not as if I had a choice to do this and overtake someone else role for the week; this was literally been missing since Miguel took over as a PM and I was to occupied with the workload of the game assets, character rigged and animation

21st-22nd May 2015

Well as I am the guy who did the planning for this week so I had to lead by an example. I get most of the 3D assets done asap because theses are the prioties that is needed for the game world. Johnson, the other artist ,was really hit hard with sickness and again I had to cover the load up to get things done till he recovers. Even when he's isn't fully recovering he still make an effort to get most of the stuff needed so that it could be used for the team.

Sprite Arrow/material

More Billboard designs
Working on the sprite

making it work
Reflection of the day: With all the tension going earlier, It actually make us stronger as a team. We are helping one another and crossing over each other path to get things done efficiently. Ryan returning to the team works wonders as well!

No comments: